News Center

——  NEWS CENTER  ——

News Center
Contact Us

Xi'an Shenghongchuang Instrument Co., Ltd.

Contact: Mr. Zhang

Mobile: 15529283736
Email: shc-sensor@qq.com

Address: Fortune Building, Sanqiao Street, Xixian New Area, Xi'an, Shaanxi Province

Two Departments Announce Key Projects for Metrology to Support the Development of New-Quality Productive Forces in 2026
Added to Favorites:125

The State Administration for Market Regulation and the Ministry of Industry and Information Technology jointly released the 2026 “Top Ten Key Projects” for metrology to support the development of new quality productive forces in industry. The input summary gives the release date as November 18, 2026; the date of the event itself is not specified. The projects involve fields such as next-generation information technology, artificial intelligence, aerospace, and new energy, and address metrology challenges related to R&D, procurement, testing, and delivery. For companies across the industrial chain, it is worth watching whether the resulting advances can be translated into verifiable, usable metrology capabilities and whether supporting requirements emerge later.

Ten metrology projects launched to tackle key challenges; 117 industrial achievements added to the catalog

According to the information provided, the two ministries jointly released the 2026 “Top Ten Key Projects” for metrology to support the development of new quality productive forces in industry. Ten projects addressing critical metrology challenges were approved, including the development of an in-situ wafer calibration device, and 117 industrial metrology achievements were added to the catalog.

The projects cover fields such as next-generation information technology, artificial intelligence, aerospace, and new energy, and aim to address industrial bottlenecks in “what cannot be measured, what cannot be fully measured, and what cannot be measured accurately.” The input does not list the details of the other projects or explain how the cataloged achievements will be applied.

Changes in metrology capabilities may affect R&D and delivery

Manufacturing and equipment development: Assess whether measurement conditions are suitable

From an industry perspective, projects such as the development of an in-situ wafer calibration device are directly related to building industrial measurement capabilities. For companies engaged in developing related equipment, manufacturing, and system integration, if the resulting advances enter the application stage, they may affect the selection of measurement solutions for R&D validation, equipment commissioning, or production processes.

Companies can focus on the measurement targets, operating conditions, and validation methods for which the results are intended, and assess their suitability for their own equipment and processes. In our analysis, even if a new metrology solution shows application potential, it still needs to be verified against the requirements of specific production scenarios. Project approval alone is not evidence that equipment performance has improved or that an existing solution can be replaced.

Procurement and supply chains: Check technical requirements and validation responsibilities

In our analysis, buyers and suppliers may follow these developments when selecting metrology equipment, communicating technical documentation, and conducting delivery acceptance. If project results are later incorporated into specific procurement requirements, the parties may need to clarify measurement ranges, validation methods, documentation, and acceptance responsibilities.

For suppliers, it is worth monitoring whether customer technical specifications or tender documents change, and whether any new wording corresponds to verifiable implementation conditions. For buyers, inclusion of an achievement in the catalog does not mean that it is suitable for every application. Before procurement, its suitability, delivery capabilities, and technical support arrangements can still be checked against the intended use.

Testing and quality management: Pay attention to comparability of results

From a quality management perspective, if metrology projects produce applicable technical advances, they may offer new solutions to some measurement challenges and may also give rise to a need to compare new and existing methods. Testing service providers and companies that use test results can pay attention to whether the measurement conditions, method descriptions, and result records are sufficient to support communication between the parties.

The input does not specify any new certification system, mandatory testing items, or unified acceptance criteria. Therefore, at this stage, the project announcement should not be interpreted as requiring companies to change their testing methods, nor as confirming that existing test reports must be reissued. Specific requirements should be based on applicable official documents and business agreements.

From project developments to business preparation: Four areas to check

Follow project details and the scope of applicability of results

Companies can continue to check publicly available updates, identify projects relevant to their products, equipment, or production processes, and learn about their R&D progress, intended applications, and conditions of use. The 117 cataloged achievements indicate that existing results have been included in the relevant list, but the input does not specify the maturity level, access arrangements, or promotion scope of each achievement. Each should therefore be checked individually before adoption.

Review existing measurement challenges and technical documentation

For processes where measurement is difficult, companies can, as appropriate, document the measurement targets, operating conditions, current methods, and result records, then compare them with information on subsequently published results. Relevant technical documents, equipment manuals, and testing records can also serve as internal assessment materials to help determine whether a new solution is suitable. This is a recommended preparatory measure, not an indication of any new uniform reporting requirement.

Specify validation methods in procurement and delivery documents

If a procurement project involves relevant metrology capabilities, our analysis suggests that, where practicable, buyers and sellers discuss in advance how technical indicators should be stated, how validation will be arranged, and what documentation will be delivered. For replacement equipment or a new solution, its compatibility with existing processes and testing workflows can first be assessed. Whether to adopt it can then be determined based on the contract and actual test results, avoiding the treatment of project results that remain undefined as confirmed acceptance criteria.

Verify standards, certification, and customer requirements separately

The input does not provide standard numbers, certification rules, or implementation dates. If companies encounter changes to customer requirements, they can separately verify whether the basis is a formal standard, a regulatory requirement, or a specific contractual agreement, and confirm which products and delivery scope the requirement applies to. For trade or cross-company deliveries, documentation requirements should likewise be verified against the actual contract and applicable rules; project approval should not be taken as evidence that trade rules have changed.

After project approval, the key question is how results are put into practice

In our view, this news is best understood as a signal of project planning and efforts to tackle challenges in support of industrial development through metrology. What has been confirmed is the release of the key projects, the approval of ten projects to tackle metrology challenges, and the addition of 117 achievements to the catalog. The input is not sufficient to establish when these achievements will be put into specific applications, or to conclude that new mandatory standards, certification, or market access requirements have taken effect.

Developments worth monitoring include project details, validation and usage conditions for the results, any supporting documents that may be issued, and feedback from buyers and industry participants. If the technologies are incorporated into subsequent standards, tender documents, or contracts, companies will still need to distinguish the scope and binding nature of those documents before assessing their actual impact on costs, delivery lead times, and supply chain coordination.

Use metrology needs as a guide to assessing future developments

By focusing on industrial challenges involving what “cannot be measured, cannot be fully measured, and cannot be measured accurately,” these projects provide a clear direction for identifying and addressing measurement difficulties in related fields. For companies, a prudent approach is to continue monitoring developments in light of their own business, verify applicable conditions, and assess procurement, testing, and delivery arrangements once specific requirements are clear. At this stage, the project announcement itself cannot replace verification against formal rules and actual application results.

Sources and further verification

This article is based on the news headline, event date, and event summary provided by the user. No specific official source link was included in the input, so the information will need to be verified on an ongoing basis. Companies can monitor official announcements and relevant documents from the two ministries, as well as follow project details, conditions for applying the results, any potentially relevant standards or certification requirements and their implementation criteria, changes to tender documents, and industry feedback.

Submit
Next Page:This is already the last item