XASHC
  • Home

  • About Us

  • Product Center

  • News Center

  • Contact Us

Contact Us:8615529283736

EnglishEnglish


简体中文简体中文русскийрусский
  • 铁路压力变送器用于列车制动系统时需要关注哪些验证项目?
    What validation items should be considered when using railway pressure transmitters in train braking systems?
    What key items need to be validated when railway pressure transmitters are used in train braking systems? This article reviews validation requirements for measurement points such as the brake pipe, main air reservoir, and brake cylinder, covering range and accuracy, dynamic response, pressure resistance and sealing, pressure cycling, vibration and shock, electromagnetic compatibility, and fault response. It also explains requirements for interface compatibility, system integration testing, and batch traceability to help quality control, procurement, and safety management personnel develop traceable validation checklists.

    Copyright © 2022Xi'an Shenghongchuang All rights reserved 陕ICP备19020231号-3

    
    
    8615529283736
    
    shc-sensor@qq.com
    